Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser

Página de inicio > Caso > Gold flotation tailing dry discharge technology upgrade project
Gold flotation tailing dry discharge technology upgrade project
09 January 2023|418 View

Project name: Gold flotation tailing dry discharge technology upgrade project

Gold-flotation-tailing-dry-discharge-technology-upgrade-project

Details:

1. Capacity: 1300ton/day(dry measure)- particle size: 200mesh -60%.

2. Sieve: Scene investigation, design, manufacturing, technology and installation guide, one to one after sales service.

Gold-flotation-tailing-dry-discharge-technology-upgrade-project

3. Our advantages: Upgrade 4 sets 80㎡ ceramic filter with our 2 sets BF-120㎡ new type ceramic filters. After replaced the effect is very good.Improve the automation, ceramic plate cleaning and capacity also lower down the filter cake moisture rate.

4. Equipment list: BF-120㎡ ceramic vacuum filter 2 sets.

Gold-flotation-tailing-dry-discharge-technology-upgrade-project

5. Project result: Save the labour cost and the maintenance cost. Lower down the energy consumption.

video:

related cases